Stage 3

6th November

The trenching is completed with no issues. A NZ$6000 drill bit was used to dig the 10m or so from the endpoint to the edge of my house. The hole was dug in two parts, under the driveway, then through to the house. It is dug at a depth of around 400mm and then a conduit is pushed through.


The endpoint of the ducting from the Distribution Point


The endpoint, uncovered, ready to be connect to the ETP on my house



The digging under the driveway.